TABLE OF CONTENTS
Introduction
Environmental
Monitoring and Audit Progress
Breaches
of Action and Limit Levels
Reporting
Changes
Future
Key Issues
Purpose
of the report
Structure
of the report
Background
Project
Organization
Summary
of Construction Works Undertaken During Reporting Month
Construction
Programme
Status
of Environmental Licences, Notifications and Permits
Monitoring
Requirements
Monitoring
Location
Monitoring
Equipment
Monitoring
Parameters, Frequency and Duration
Monitoring
Methodology and QA/QC Procedure
Results
and Observations
Event
and Action Plan
Monitoring
Requirements
Monitoring
Location
Monitoring
Equipment
Monitoring
Parameters, Frequency and Duration
Monitoring
Methodology and QA/QC Procedures
Maintenance
and Calibration
Results
and Observations
Event
and Action Plan
Monitoring
Requirements
Monitoring
Parameters, Frequency
Results
and Observations
Monitoring
Requirements
Monitoring
Locations
Monitoring
Equipment
Monitoring
Parameters and Frequency
Monitoring
Methodology
QA/QC
Requirements
Results
and Observations
Event
and Action Plan
6 LAND CONTAMINATION
(AMBIENT ARSENIC MONITORING)
Monitoring
Requirements
Monitoring
Location
Monitoring
Equipment
Monitoring
Parameters, Frequency and Duration
Monitoring
Methodology and QA/QC Procedure
Maintenance/Calibration
Laboratory
Measurement / Analysis
Results
and Observations
Event
and Action Plan
Monitoring
Requirement
Monitoring
Parameters and Frequency
Monitoring
Locations
Monitoring
Equipment
Results
and Observations
Event
and Action Plan
Monitoring
Requirement
Monitoring
Location
Monitoring
Parameters and Frequency
Results
and Observations
Event
and Action Plan
Monitoring
of Measures to Minimise Disturbance to Water Birds in
Ng Tung River, Sheung Yue River, Shek Sheung River
and Long Valley
Monitoring
of Measures to Minimise Impacts to Ma Tso Lung Stream
and Siu Hang San Tsuen Stream, and Long Valley
Monitoring
of Measures to Minimise Impacts on Ecological
Sensitive Habitats from Disturbance and Pollution
Results
and Observation
Reference
10 ENVIRONMENTAL SITE
INSPECTION
Site
Audits
Implementation
Status of Environmental Mitigation Measures
Solid
and Liquid Waste Management Status
11 ENVIRONMENTAL NON-CONFORMANCE
Summary
of Exceedances
Summary
of Environmental Non-Compliance
Summary
of Environmental Complaint
Summary
of Environmental Summon and Successful Prosecution
Key
Issues in the Coming Two Months
Monitoring
Schedule for the Next Month
Construction
Programme for the Next Month
13 CONCLUSIONS AND
RECOMMENDATIONS
Conclusions
Recommendations
LIST
OF TABLES
Table I Works
Contracts under relevant Environmental Permit(s) in the Reporting Month
Table II Summary
Table for EM&A Activities in the Reporting Month
Table III Summary
Table for Events Recorded in the Reporting Month
Table IV Summary
Table for Site Activities in the coming Two Months
Table 2.1 Summary
of EPs under the Project and the Respective Work Contracts
Table 2.2 Key
Contacts of the Project
Table 2.3 Summary
Table for Major Site Activities in the Reporting Month
Table 2.4 Status
of Environmental Licences, Notifications and Permits
Table 3.1 Location
for Air Quality Monitoring Locations
Table 3.2 Air
Quality Monitoring Equipment
Table 3.3 Impact
Dust Monitoring Parameters, Frequency and Duration
Table 3.4 Summary
Table of 1-hour TSP Monitoring Results during the Reporting Month
Table 3.5 Summary
Table of 24-hour TSP Monitoring Results during the Reporting Month
Table 3.6 Observation
at Dust Monitoring Stations
Table 4.1 Location
for Noise Monitoring Stations
Table 4.2 Noise
Monitoring Equipment
Table 4.3 Noise
Monitoring Parameters, Duration and Frequency
Table 4.4 Summary
Table of Noise Monitoring Results during the Reporting Month
Table 4.5 Observation
at Noise Monitoring Stations
Table 5.1 Water
Quality Monitoring Parameters and Frequency
Table 5.2 Additional
Water Quality Monitoring Stations
Table 5.3 Water
Quality Monitoring Equipment
Table 5.4 Additional
Water Quality Monitoring Parameters and Frequency
Table 5.5 Method
for Laboratory Analysis for Water Samples
Table 5.6 Summary
of Exceedance Records of Water Quality Monitoring in the Reporting Month
Table 6.1 Location
of Ambient Arsenic Monitoring station
Table 6.2 Ambient
Arsenic Monitoring Equipment
Table 6.3 Impact
Ambient Arsenic Monitoring Parameters, Frequency and Duration
Table 6.4 Summary
Table of 24-hour RSP Monitoring Results during the Reporting Month
Table 7.1 Landfill
Gas Monitoring Equipment
Table 8.1 Vibration
Monitoring Plan
Table 8.2 Vibration
Limit for Construction Vibration Monitoring
Table 10.1 Summary
of Site Audit
Table 10.2 Observations
and Recommendations of Site Audit
Table 10.3 Photographic
Records and Implementation Status of Measures
LIST
OF DRAWINGS
LIST
OF FIGURES
Figure 1 Location
of Air Quality Monitoring Station (KTN)
Figure 2 Location
of Air Quality Monitoring Station (FLN)
Figure 3 Location
of Noise Monitoring Station (KTN)
Figure 4 Location
of Noise Monitoring Station (FLN)
Figure 5 Location
of Additional Water Quality Monitoring Stations at River Beas
Figure 7 Location
of Ambient Arsenic Monitoring Station
Figure 8 Location
of Landfill Gas monitoring
Figure 10 Location
of Monitoring Stations at Ma Tso Lung Stream and Siu Hang Sun Tsuen Stream
Figure 12 Hoarding
Plan of EP-466/2013
Figure 13 Hoarding
Plan of EP-467/2013/A
Figure 14 Hoarding
Plan of EP-468/2013/A
Figure 15 Hoarding
Plan of EP-469/2013
Figure 16 Hoarding
Plan of EP-473/2013/A
Figure 17 Hoarding
Plan of EP-475/2013/A
LIST
OF APPENDICES
Appendix A Construction
Programme
Appendix B Action
and Limit Levels
Appendix C Copies
of Calibration Certificates
Appendix D Environmental
Monitoring Schedules
Appendix E Air
Quality and Ambient Arsenic Monitoring Results and Graphical Presentation
Appendix F Noise
Monitoring Results and Graphical Presentation
Appendix G Water
Quality Monitoring Results and Graphical Presentations
Appendix H Laboratory Testing Reports for Laboratory Analysis
Appendix I Quality
Control Reports for SS and Arsenic Laboratory Analysis
Appendix J Landfill
Gas Monitoring Results
Appendix K Ecological Monitoring Results
Appendix N Summary
of Exceedance
Appendix P Environmental Mitigation Implementation Schedule (EMIS)
Appendix Q Waste
Generation in the Reporting Month
Appendix S Summary of Successful Prosecution
Appendix T Summary Table for Required Submission under
Environmental Permits